Menu
  • Home
  • London Exchange
  • Euronext
  • Australian Exchange
  • Wire
  • Contact Us
  • Business & Finance
NewsnReleases

Serica Energy announces first production from Rhum R3 Well

Posted on September 2, 2021October 24, 2023
Serica Energy announces first production from Rhum R3 Well

LONDON, UK: Serica Energy announced the commencement of production from the Rhum R3 well. Serica has a 50% working interest in the Rhum field.

Serica Energy is a British independent upstream oil and gas company with operations centred on the UK North Sea and over 80% gas production.

First production from the well was achieved on 23 August and since then work has continued to optimise production rates from the Bruce, Keith and Rhum fields.

In the last seven days, gross Rhum production has averaged over 190mmcsf/d of gas and 1,400bbl/d of condensate. This equates to an average gross production in excess of 34,000boe/d for the Rhum field.

This compares to a maximum rate of 26,000boe/d immediately prior to the commencement of R3 production. Further work will continue in the coming weeks to optimise and stabilise production and if necessary, we will update our production guidance at the time of the publication of our half year results.

The successful recompletion of R3 has increased the Rhum production capacity utilising the existing facilities located on the Bruce platform. This is in line with Serica’s stated objective of reducing the carbon intensity (i.e. CO2 per barrel of oil equivalent) of its production operations.

 Mitch Flegg, Chief Executive of Serica Energy, commented: “I would like to congratulate everyone in the Company for the incredible achievements required to overcome the technical challenges involved in establishing first production from this well some 16 years after it was originally drilled.

This is a significant result for Serica and the addition of a third prolific Rhum well is excellent news. Despite the challenges we faced, the additional production and accelerated cash flows will lead to a rapid payback on the capital invested, particularly as we are immediately benefitting from the current high gas prices. Not only will this well enable enhanced production rates from the field, but it will also provide redundancy to help maintain future production.

The successful R3 project is a demonstration of Serica’s ongoing strategy of investment in capital growth projects designed to boost our production levels whilst continuing to reduce our carbon intensity. The next project will be Columbus where we expect first production in Q4 this year.”

Serica Energy Plc share price

164.00 GBX0.00 (0.00%)today

1 Sep, 5:07 pm GMT+1 ·Disclaimer

www.serica-energy.com

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Track all markets on TradingView

Investing.com .

Site Navigation

  • Home
  • Listed Companies
  • Contact Us
  • London Stock Exchange
  • Singapore Exchange
  • Canadian Exchange
  • Australian Exchange
  • Oslo Bourse
  • PSX
  • Ratings
  • Euronext
  • MENA
  • Nasdaq Nordic
  • Wire
  • Business & Finance
  • Gadget Reviews
  • About Us: A Comprehensive Financial News Database

All news and articles on NewsnReleases are based on press releases, corporate announcements and analysts’ reports issued to London Stock Exchange (LSE), Euronext, Singapore Exchange (SGX), Japan Stock Exchange (JPX), Dubai Financial Market (DFM), Saudi Stock Exchange (Tadawul), Qatar Stock Exchange (QSE), BSEIndia, Australia Stock Exchange etc.

Listed Companies

Equity Markets and Stock Exchanges

NNR

©2025 NewsnReleases | WordPress Theme by Superb WordPress Themes