VICTORIA: Kalamazoo Resources Limited has successfully commenced its Stage 1 diamond drilling campaign within EL6679 of the Castlemaine Gold Project.
This initial drilling program is designed to test the encouraging results and interpretations of the extensive ground geophysical surveys and 3D structural modelling recently carried out by Kalamazoo.
The program forms the first part of the recently announced 10,000m drilling campaign at the Castlemaine Gold Project, which will be undertaken in two stages.
Drilling will focus on prioritized high-grade gold exploration targets defined within the private Pine Plantation area in EL6679, which has already recorded several high-grade intersections in historical drill holes.
It is anticipated that this initial program (approximately 10 holes x 400m each) will take approximately three months to complete. The results will be used to further refine Kalamazoo’s conceptual high-grade gold model and priority targets, in addition to providing critical input into future planned geophysical surveys and the Stage 2 drilling program in early 2020.
Leave a Reply